14 Eylül 2012 Cuma

Universal Studios: Transformers Goes Vertical (Part 2)

To contact us Click HERE

Time to continue with our update (PART 1 can be found here):


More Transformers construction:




Panoramic view of the area (FULL-SIZE):




One more (FULL-SIZE):











Soon we will not be able to see Twister from Mel's:



By the way, minor work is being done on one of the planters by Mel's:







This is one big crane:

But there's another one that seems bigger right across the street:


We'll get there in a minute!:

Let's now move over to the former Amity area, where something else is taking place:







The waterfront is looking great:







A couple of panoramic photos (FULL-SIZE):



This may look similar, but it shows better the new railing on the far left (FULL-SIZE):




Some concrete walkways and light fixtures will soon show up in the area as well:









A closer look at the new walkways (no cement yet):





Particulars:



And, as you can see, the water is back!:





A look at the waterfront from other angles:












The new railing we were referring to before:


CLICK HERE TO GO TO PART 3 OF THIS (GREAT) UNIVERSAL STUDIOS UPDATE >
Copyright of Orlando Theme Park News.


Hiç yorum yok:

Yorum Gönder